Transparent, step-by-step process

Step 1: Total building survey

  • Examining utility bills (water, sewage, gas, and electric – past 12 months)
  • Calculating building/property square footage
  • Surveying illumination and lighting (LED vs. non-LED)
  • Gathering photos and detailed information from applicable machinery (HVAC, cooling tower, chillers, boilers, power units/panels, generators, etc.).

Step 2: Preliminary financial model

  • Identifying cost savings of replacing or adding new products
  • Quoting the cost of units needed for replacement products

Step 3: Preliminary proposal

  • Estimating cost and energy saving using preliminary financial model
  • Finalizing and reviewing with client

Step 4: Section 179D survey and report

  • Analyzing and compiling building information

Step 5: Install measurement and verification units

  • Establishing baseline figures

Step 6: Begin retrofit/installation process

  • Sourcing proper assistance and appropriate labor needs
  • Finalizing orders and receiving specified materials

Step 7: Completed installation of new products and materials

  • Service and quality checklist finalized
  • Dashboard and monitoring system set up

Step 8: Enabling digital twin for real-time transparency

  • Ongoing performance updates and cost-saving estimates
  • Accurate reporting with 360° transparency for all parties

Step 1: Total building survey

  • Examining utility bills (water, sewage, gas, and electric – past 12 months)
  • Calculating building/property square footage
  • Surveying illumination and lighting (LED vs. non-LED)
  • Gathering photos and detailed information from applicable machinery (HVAC, cooling tower, chillers, boilers, power units/panels, generators, etc.).

Step 2: Preliminary financial model

  • Identifying cost savings of replacing or adding new products
  • Quoting the cost of units needed for replacement products

Step 3: Preliminary proposal

  • Estimating cost and energy saving using preliminary financial model
  • Finalizing and reviewing with client

Step 4: Section 179D survey and report

  • Analyzing and compiling building information

Step 5: Install measurement and verification units

  • Establishing baseline figures

Step 6: Begin retrofit/installation process

  • Sourcing proper assistance and appropriate labor needs
  • Finalizing orders and receiving specified materials

Step 7: Completed installation of new products and materials

  • Service and quality checklist finalized
  • Dashboard and monitoring system set up

Step 8: Enabling digital twin for real-time transparency

  • Ongoing performance updates and cost-saving estimates
  • Accurate reporting with 360° transparency for all parties

Start your Energy Transition Now!