Step 1: Total building survey
- Examining utility bills (water, sewage, gas, and electric – past 12 months)
- Calculating building/property square footage
- Surveying illumination and lighting (LED vs. non-LED)
- Gathering photos and detailed information from applicable machinery (HVAC, cooling tower, chillers, boilers, power units/panels, generators, etc.).
Step 2: Preliminary financial model
- Identifying cost savings of replacing or adding new products
- Quoting the cost of units needed for replacement products
Step 3: Preliminary proposal
- Estimating cost and energy saving using preliminary financial model
- Finalizing and reviewing with client
Step 4: Section 179D survey and report
- Analyzing and compiling building information
Step 5: Install measurement and verification units
- Establishing baseline figures
Step 6: Begin retrofit/installation process
- Sourcing proper assistance and appropriate labor needs
- Finalizing orders and receiving specified materials
Step 7: Completed installation of new products and materials
- Service and quality checklist finalized
- Dashboard and monitoring system set up
Step 8: Enabling digital twin for real-time transparency
- Ongoing performance updates and cost-saving estimates
- Accurate reporting with 360° transparency for all parties
Step 1: Total building survey
- Examining utility bills (water, sewage, gas, and electric – past 12 months)
- Calculating building/property square footage
- Surveying illumination and lighting (LED vs. non-LED)
- Gathering photos and detailed information from applicable machinery (HVAC, cooling tower, chillers, boilers, power units/panels, generators, etc.).
Step 2: Preliminary financial model
- Identifying cost savings of replacing or adding new products
- Quoting the cost of units needed for replacement products
Step 3: Preliminary proposal
- Estimating cost and energy saving using preliminary financial model
- Finalizing and reviewing with client
Step 4: Section 179D survey and report
- Analyzing and compiling building information
Step 5: Install measurement and verification units
- Establishing baseline figures
Step 6: Begin retrofit/installation process
- Sourcing proper assistance and appropriate labor needs
- Finalizing orders and receiving specified materials
Step 7: Completed installation of new products and materials
- Service and quality checklist finalized
- Dashboard and monitoring system set up
Step 8: Enabling digital twin for real-time transparency
- Ongoing performance updates and cost-saving estimates
- Accurate reporting with 360° transparency for all parties